Boyd Street South Pipe Upgrades

Background

The drainage pipe along Boyd Street South between Wood Street and Boyne Street is undersized and requires upsizing to improve drainage in the area. 

The upgrade to existing infrastructure will see the existing 250mm diameter storm sewer pipe replaced by a 750mm diameter HDPE pipe.

Construction work is scheduled to start in September 2019 and will be completed in conjunction with the Wood Street Canal dredging and Johnston Street culvert replacement works.