Building Permits & Inspections

Find information about permits, inspections, fees, and requirements for your building project. The Building Permits section includes building permits and trade permits, including plumbing, sprinkler, outside service, and other related permits.

Use the links below to learn about permit requirements, schedule inspections, view applicable fees, access forms and documentation, and review relevant bylaws and regulations.

 

Building Division Notices

New Provincial Asbestos Regulations

As of January 1, 2024, asbestos abatement contractors must be licensed to operate in British Columbia, and anyone performing asbestos abatement work in relation to buildings must be certified.

Cold Weather Concrete Pours

When the air temperature is below 5° C, special considerations for concrete pours must be given. Poured concrete must be maintained at a temperature of 10° C for a period of at least 72 hours. Contractors and Builders will be asked how they will maintain this temperature for the set period of time, a Field Review prior to Forms Inspection from a Professional Engineer confirming approval of cold weather concrete plan will be required. If City Staff deem the heating plan to be unsatisfactory, the Forms Inspection will not be conducted until after temperatures are forecasted increase above 5° C for a continuous 72 hour period.

Contact the Building Division

Building and Plumbing Inspectors are generally available by phone from 8:30 a.m. to 9:30 a.m., Monday through Friday.

Email

Note: The following email links open a new email composition window in a separate browser tab.

Phone

General Inquiries: 604-527-4580