Advanced Metering Infrastructure

The City of New Westminster is currently upgrading its electrical metering equipment, which is nearing end-of-life, with a more capable metering system known as advanced metering infrastructure (AMI). All of the City's meters must be replaced in order to comply with Measurement Canada accuracy requirements.

On This Page

Customer Benefits

Advanced meters are one part of a collective system upgrade. Once the new system is functioning as a whole, advanced meters will support a range of features and capabilities.

Benefits to you include:

  • Having greater insights into your energy usage will help you reduce energy waste and save money
  • Outage response times will be faster and more targeted
  • Enhanced safety features will help protect your home and community
  • The utility will have improved operation efficiency and will reduce costs over time
  • A modernized grid will support innovative technologies such as electric vehicles and solar panels
  • Reduction of the City's carbon emissions
Video file

About the Project

The City's existing metering equipment is aging, becoming obsolete, and costly to maintain. Our infrastructure needs to be upgraded to meet the demands of our growing community. AMI will be better able to support the dynamic needs of a modern grid and will accommodate new and sustainable technologies that are part of New Westminster's climate emergency response.

The contract for the Advanced Metering Infrastructure project was awarded to KTI Utility Services for the supply and installation of the new meters, and to Harris Computer Systems for the IT infrastructure.

The exchange and installation of residential AMI meters were completed in July 2025. The City is now proceeding with the deployment of commercial meters, with completion expected by early 2027. Affected businesses will be notified in advance of installation activities.

Safety and Privacy

Safety

Your privacy and safety are important. Advanced meters communicate using safe, secure low-level radio signals. The signals from the meters are much lower than common household devices such as:

  • Wi-Fi routers
  • Cell phones
  • Microwave ovens
  • Baby monitors

All electrical meters must pass strict safety and accuracy measures established by federal authorities such as Health Canada and Measurement Canada. The meters we have selected are compliant with all appropriate standards set by Health Canada.

Exposure to radiofrequency energy below Health Canada's established limits is safe. The limits are set far below the threshold for all known established adverse health effects.1 There are no health risks from exposure to radiofrequency electromagnetic fields (EMF) from advanced meters. Your exposure to radiofrequency EMF from advanced meters is very low.2 This is because:

  • Advanced meters emit relatively low power signals
  • There is distance between your body and advanced meters
  • Advanced meters transmit data in short bursts, not continuously
  • When advanced meters are not transmitting a signal, they do not emit radiofrequency EMF

Privacy

We place a high priority on customer privacy, and we must protect your personal information by law. All personal information collected is managed in accordance with the Freedom of Information Protection of Privacy Act, as it has always been. Our vendor, and our internal teams, will all work together to ensure your information is kept private.

Additional Resources:

Government of Canada (sources cited)
  1. Radiofrequency Energy and Safety
  2. Safety of smart meters
Health Canada
World Health Organization

Frequently Asked Questions