Brunette-Fraser Regional Greenway Trail Repair

Project Status
In Progress
Category
Parks and Environment, Roads, Transit, and Safety

Project Overview

In late January 2026, through a community report, the City confirmed the formation of a large tension crack along a portion of the Brunette-Fraser Greenway trail between Hume Park and Braid Station. Out of caution for public safety, the City closed this section of the trail to conduct a thorough engineering review.

A detailed site assessment involving specialized subsurface drilling (boreholes) and installing temporary wells was undertaken to carefully monitor ground and water conditions under the path. While this vital investigation was underway, the slope naturally deteriorated further. Prolonged weather and environmental factors caused a slope failure below the trail, which sloughed away roughly half of the active trail walking and cycling surface.

Because the physical path has been significantly compromised, this section of the trail must remain closed to all visitors and commuters until a permanent, safe solution is constructed.

Image of the trail failure taken on May 20, 2026.

Image
Large crack in trail

ALTERNATE ROUTE

Please use the alternate route along Braid Street, Wilson Street, and Hume Park. See map below.

Image
Map of detour route for Brunette Fraser Greenway

Frequently Asked Questions (FAQ)

Project Contact

For more information, please contact: