Queensborough Shoreline Rehabilitation Project

Project Status
Completed
Category
Parks and Environment

Project Overview

Construction of Location 2 of the Queensborough Shoreline Rehabilitation was completed in Summer 2026. 

Project Background

This phase built on the successful stabilization works completed in Location 1 and continues the City's commitment to enhancing shoreline resilience along the Queensborough foreshore.

The Queensborough Shoreline Rehabilitation Project focuses on rebuilding and reinforcing a section of the dyke to enhance its structural stability and resilience. The project involves the removal of invasive plant species, unsuitable soils, and outdated materials, followed by the import of structural fills and rock to strengthen the shoreline. These improvements are critical for protecting the dyke against erosion and ensuring its long-term reliability for flood prevention.

In addition to the structural enhancements, the project includes a comprehensive re-vegetation plan. Native and non-invasive plant species will be introduced to restore the natural environment, enhance the ecological health of the shoreline, and improve the visual appeal of the area. This rehabilitation effort reflects the City's commitment to sustainable infrastructure and environmental stewardship.

Construction of Location 1 was completed in July 2025. The work included removing unstable timber and debris, reshaping the slope, placing geotextile and protective rock armour, and implementing native shoreline plantings. These measures have strengthened the dyke, improved habitat function, and enhanced visual quality along the waterfront.

Image
Queensborough shoreline showing water and debris