Project Overview

The Carnarvon Street Watermain Replacement Project will replace aging water infrastructure along Carnarvon Street between Eighth Street and Tenth Street.

The work includes installing approximately 260 metres of watermain, two new fire hydrants, and six large-diameter service connections. The project is intended to renew existing water infrastructure and improve the reliability of the water distribution system after the watermain break in the spring.

Construction Updates

Update: October 29, 2026

Tie-in work will begin on November 3, requiring overnight work and water shutdowns. Businesses and residents will be notified via letter in advance of when the water shutdown for their building will take place.

Overnight work:

  • Dates: November 3 to 17
  • Work Hours: 8:00 pm – 7:00 am

The work is expected to have a moderate noise impact. Water main tie-ins, work includes pipe cutting, fitting installation, valve operation, and associated pumping and excavation as required. Noise will be reduced by completing preparatory work during daytime hours, minimizing equipment idling, and positioning equipment away from residences where feasible.

General Work Hours:

  • Monday - Friday: 7:00 am to 5:00 pm
  • Saturdays: 9:00 am to 5:00 pm

Frequently Asked Questions

Project Contact

If you have any immediate questions or concerns, please contact Shahrzad Eghtesadi, at seghtesadi@newwestcity.ca.