| Street Occupancy Permit Application and Traffic Management Plan Review Fee – Level 1 | $128.00 per initial permit |
| Street Occupancy Permit Application and Traffic Management Plan Review Fee – Level 2 | $256.00 per initial permit |
| Street Occupancy Permit Application and Traffic Management Plan Review Fee – Level 3 | $528.00 per initial permit |
| Street Festival | $173.00 per block |
| Parade | $42.00 per block |
| Block Party (local street only) | No fee |
Construction, maintenance and/or ancillary works on a street or boulevard on a: Local Street | $59.50 per block face per day |
Construction, maintenance and/or ancillary works on a street or boulevard on a: Collector, Great Street, MRN street, cycle route, greenway | $91.00 per block face per da |
Installation, maintenance and/or removal of utilities on a street or boulevard (excluding City Works) on a: Local Street | $59.50 per block face per day |
Installation, maintenance and/or removal of utilities on a street or boulevard (excluding City Works) on a: Collector, Great Street, MRN Street, cycle route, greenway | $91.00 per block face per day |
Hoarding and/or staging area for private development on a street or boulevard on a: Local Street | $59.50 per block face per day |
Hoarding and/or staging area for private development on a street or boulevard on a: Collector, arterial, Great Street, MRN street, cycle route, greenway | $91.00 per block face per day |
| Closure of existing sidewalk, multi-use pathway, protected bicycle lane, with no alternate provision | $53.50 per block face per day |
| Closure of existing sidewalk, multi-use pathway, protected bicycle lane, with accessible alternative provisions for foot traffic and people using various wheeled micro-mobility devices | $10.25 per block face per day |
| Parking of unattached commercial trailer or container on a street | $59.50 per day |
| Parking of unattached recreational or utility trailer on a street | $12.30 per day |
| Parking of recreation vehicle on a street | First 48 hours free, then $12.30 per day thereafter |
| Rental of each metered parking stall or equivalent metered zone | $36.00 per day |
| Temporary No Parking Sign Installation and Removal | $81.00 per block face |
| Temporary Barricade Use | $63.50 per intersection |
| Pre-, post-, and other construction inspection fee | $102.50 per inspection |
| Redemption of Impounded chattel | $35.00 |