The Advanced Metering Infrastructure (AMI) project installation phase began in September 2024. Some electrical meters across the city are currently obstructed and need to be cleared before replacement.
Why You Need to Remove Obstructions
To ensure your electrical meter is replaced efficiently, owners or occupants must remove any obstruction on or near the electrical meter in compliance with Electric Utility Bylaw No. 6502, 1998, section 30.
Important: Failure to remove a meter obstruction may result in:
- Delayed meter replacement
- Radio-off charges added to your utility account
Space Requirements
The City's contractor needs:
- One (1) metre of unobstructed access in front of the meter
- Clear access around the meter to perform the installation
Common Obstructions
Examples of obstructions include:
- Custom-built enclosures
- Large shrubs or bushes
- Fences
- Home renovations that block meter access
- House siding or panel covers preventing access to the meter, meter base, and meter ring
How to Remove Obstructions
There must be enough space around the meter, meter base, and meter ring to exchange the electrical meter.
General guide: If the meter base cover can be removed, there is likely enough space for the meter ring to be removed and the meter to be exchanged.
Note: If you have a meter cover or panel, it should be easily removable or hinged.
Need help?
After removing the obstruction
For Tenants
Acceptable Examples
Proper framing around the meter base is not impeding access to the meter, meter base, and meter ring.

Meter cover that is easily removable by removing screws.

Unacceptable Examples
House siding or panel cover is preventing access to meter, meter base, and meter ring.