There’s a sign already in place in the location I’m moving into. I will only be changing the face of the sign to the name of my business. Do I need a sign permit?

Maybe. Sign Permits are not required for face changes on signs that were previously installed with permits. If the existing sign structure was installed without permits, then a new Sign Permit is required for any face changes. To find out if the sign on your building has a previous Sign Permit, please contact the Planning Division.